Detailed instructions on doing a NEW calibration run

Post Reply
gbussey
Posts: 12
Joined: Sat Jul 27, 2019 10:30 pm

Detailed instructions on doing a NEW calibration run

Post by gbussey »

Because of travel, I have had to break down my bike several times, including taking off the handlebars AND even removing the PowerPod V3.0 from the bars. I am now back home and have put everything back together, but because I can't be sure the PP is EXACTLY the way it was before (and I added a pitot tube), what are the exact steps I need to do to set up the PP for a new calibration ride? Thanks.
Velocomp
Velocomp CEO
Posts: 7793
Joined: Fri Jan 11, 2008 8:43 am

Re: Detailed instructions on doing a NEW calibration run

Post by Velocomp »

Do the following:

1) Attach PP to handlebars, making sure it cannot rotate on mount

2) Awaken your ANT+ speed sensor (and more, if you have them)

3) Press-hold PP button for 4 seconds, until it goes into pairing mode. When pairing is finished, light will go solid green briefly, then out

4) Click button; light is solid yellow, ready for cal ride.

5) Perform cal ride.
John Hamann
gbussey
Posts: 12
Joined: Sat Jul 27, 2019 10:30 pm

Re: Detailed instructions on doing a NEW calibration run

Post by gbussey »

Thanks. I will give that a try.
gbussey
Posts: 12
Joined: Sat Jul 27, 2019 10:30 pm

Re: Detailed instructions on doing a NEW calibration run

Post by gbussey »

Quick follow-up - it tends to not pick up the speed sensor until that gets awakened - so should I spin the wheel with the speed sensor to get it to connect?
User avatar
lorduintah
Posts: 642
Joined: Fri Jan 11, 2008 9:37 am
Location: Plymouth, MN

Re: Detailed instructions on doing a NEW calibration run

Post by lorduintah »

In order to pair to sensors, they do have to be awake. So spinning a few revolutions and then fire up the PP>
Post Reply